Eskom, South Africa’s primary electricity provider, commissioned the building of a coal-fueled power plant in Medupi, Limpopo with Ovivo contracted to design, build, implement the installation process with accompanying training manual, roll-out of training to Eskom staff to operate and maintain the facilities plus performance review throughout the stage gates. Our MD served as the principal planner for these water plants that used a multi-methodology of clarification, ultrafiltration, ion exchange organic scavenger reverse osmosis, CEDI, gas transfer membranes, pressure swing absorption, and a condensate polishing plant.